06/13/2019
pool deck slab filling

Rumeli Villas, Residence Management

Pool Deck Filling // Residence Management In this project, an existing swimming pool and it’s surrounding had to be reconstructed. The structure was above the […]
06/12/2019

Bostancı Residence, Sadıkoglu Construction

Lightweight Filling on Floor // Sadıkoglu Construction The level difference between the carpark’s top slab and the road access had to be filled with a […]
06/11/2019

Feneryolu Residence, Teminat & Orta Dogu Group

Lightweight Filling on Floor // Teminat & Orta Dogu Group ABS Plus adjustable-height disposable formwork system for lightweight fillings was preferred at ‘Feneryolu Residence’ project […]
05/07/2019

Factory Construction, Kurkcuoglu Generator

Filling Between Foundation Footings // Kurkcuoglu Generator Kurkcuoglu Generator Company preferred ABS Plus adjustable-height disposable formwork system at its new factory to fill between the […]
04/10/2019

AND Pastel, Karaoglu Landscape

Landscape Filling // AND Pastel Karaoglu Landscape Company preferred ABS Plus adjustable-height disposable formwork system for lightweight fillings on the podium area at the AND […]
03/26/2019
Reinforced Concrete Raised Floor

Porta Vadi, Tum Construction

Reinforced Concrete Raised Floor // Porta Vadi, Tum Construction ABS Disposable Formworks were preferred for reinforced concrete raised floor at Porta Vadi project by Tum Construction. Due to […]