05/07/2019

Factory Construction, Kurkcuoglu Generator

Filling Between Foundation Footings // Kurkcuoglu Generator Kurkcuoglu Generator Company preferred ABS Plus adjustable-height disposable formwork system at its new factory to fill between the […]
02/26/2019
Filling Between Foundation Footing

Porto Novi Hotel, Allucon

Filling Between Foundation Footing // Porto Novi Hotel ABS Plus disposable formwork system was preferred to fill the space between foundation footings at the Porto […]
Scroll Up