06/12/2019

Bostancı Residence, Sadıkoglu Construction

Lightweight Filling on Floor // Sadıkoglu Construction The level difference between the carpark’s top slab and the road access had to be filled with a […]
06/11/2019

Feneryolu Residence, Teminat & Orta Dogu Group

Lightweight Filling on Floor // Teminat & Orta Dogu Group ABS Plus adjustable-height disposable formwork system for lightweight fillings was preferred at ‘Feneryolu Residence’ project […]
03/12/2019
Sunken Slab Filling

Yunusoglu Residence, Yunusoglu Construction

Crawl Space Construction // Yunusoglu Residence, Yunusoglu Construction ABS Disposable Formworks were preferred for crawl space construction at Yunusoglu Residence by Yunusoglu Construction in Izmir, […]
02/06/2019
Goztepe Cakmak Flat, Anka Cakmak Construction

Göztepe Anka Flats, Anka Çakmak Construction

Göztepe Anka Flats, Anka Çakmak Construction ABS Plus is preferred as a lightweight filling instead of heavy soil filling for the reverse beams filling in […]
01/07/2019

Tekinalp Gated Community, Sena Construction

Pool Deck Filling Application This gated community needed lightweight filling around the swimming pool area that was located above the car park level. In order […]
12/21/2018

Kağıthane Housing Project, Ortadogu Group

Lightweight Filling on Floor Ortadoğu Grup preferred ABS disposable formworks for one of their housing projects in Kağıthane for the purpose of filling the space […]