03/23/2021

Hilltown Karşıyaka, Rönesans

In the Hilltown Karşıkaya project carried out by Rönesans Teknik, a practical and economical application was achieved by choosing ABS Plus solutions for filling between […]
03/10/2021

Prestij PaÅŸa Residence, Bak Construction

In Prestij Paşa Residence, one of the most prestigious housing projects in Balıkesir, which is under construction in Karesi District of Balıkesir, ABS Plus height […]
03/09/2021

İTÜ Elginkan High School, DBH

82 cm disposable formworks 8 cm concrete filling on raft foundation. It was used to raise the foundation level below the architectural level. The application […]
05/07/2019

Factory Construction, Kurkcuoglu Generator

Filling Between Foundation Footings // Kurkcuoglu Generator Kurkcuoglu Generator Company preferred ABS Plus adjustable-height disposable formwork system at its new factory to fill between the […]
02/26/2019
Filling Between Foundation Footing

Portonovi Hotel, Allucon

Filling Between Foundation Footing // Porto Novi Hotel ABS Plus disposable formwork system was preferred to fill the space between foundation footings at the Porto […]