Filling Between Foundation Footing

Filling Between Foundation Footing

Filling Between Foundation Footing // Porto Novi Hotel

ABS Plus disposable formwork system was preferred to fill the space between foundation footings at the Porto Novi Hotel in Herceg Novi, Montenegro by AlluconCompany. It was the easiest, fastest and most economical method to fill the area and to raise the ground floor to the required level by the architect.

ABS Plus disposable formworks were used not only to fill the space but also to create void space below the newly constructed concrete raised the floor. This void space was used to pass plumbing installations.

For more please contact us.

ABS Plus: Portonovi Montenegro, GMW Architecture from ABS Disposable Formworks on Vimeo.



For all pictures please click here.