Tera Construction was looking for an economical, durable and simple solution to raise the cafe’s ground clearance by 10 cm. ABS Level H5 cm was the most effective building material for this […]
Because the North Tower of the Emaar Square project is a composite structure, one of the most important design criteria is not to increase the weight of the structure by any means. Considering this, ABS […]
Because the North Tower of the Emaar Square project is a composite structure, one of the most important design criteria is not to increase the weight of the structure by any means. Considering this, ABS […]
Reinforced Concrete Raised Floor // Porta Vadi, Tum Construction ABS Disposable Formworks were preferred for reinforced concrete raised floor at Porta Vadi project by Tum Construction. Due to […]
NEF preferred ABS Level – Fixed Height Disposable Formwork System For Lightweight Fillings for their NEF 09 Office project. This was the most economical and […]