In the third phase of the Mall of Istanbul (MOI) shopping mall, ABS Plus disposable formworks were preferred as a car park ramp. The heights varied from 25 […]
Nidapark Istinye Villas project is one of the most prestigious projects in the European side of Istanbul. This project’s motto is ‘Project Without Borders in […]
Planned lightweight filling application for the Student Activities and Athletic Facilities (SAAF) was either foam (aerated) concrete or some other sort of lightweight concrete. The […]
Tera Construction was looking for an economical, durable and simple solution to raise the cafe’s ground clearance by 10 cm. ABS Level H5 cm was the most effective building material for this […]
Because the North Tower of the Emaar Square project is a composite structure, one of the most important design criteria is not to increase the weight of the structure by any means. Considering this, ABS […]
Because the North Tower of the Emaar Square project is a composite structure, one of the most important design criteria is not to increase the weight of the structure by any means. Considering this, ABS […]