03/12/2019
Elevetor/Staircase Hallway Filling

Porta Vadi, Tum Construction

Elevator/Staircase Hallway Filling // Porta Vadi, Tum Construction ABS Disposable Formworks were preferred for elevator/staircase hallway fillings at Porta Vadi project by Tum Construction. The original alternative […]
01/09/2019

NEF 09 Office Project, NEF

NEF preferred ABS Level – Fixed Height Disposable Formwork System For Lightweight Fillings for their NEF 09 Office project. This was the most economical and […]