In the Hilltown Karşıkaya project carried out by Rönesans Teknik, a practical and economical application was achieved by choosing ABS Plus solutions for filling between foundation footings ABS Plus pre-adjustable lightweight filling disposable formwork systems for light filling needs on the foundation up to H50 cm and H100 cm in a total area of 7,500 m2.
Thanks to its easy and fast installation, a significant reduction in construction time has been achieved. ABS Plus adjustable lightweight filling disposable formwork system allows filling to be made during the construction of the upper floors, thus providing a serious shortening of the construction time.
For more images.