İTÜ Elginkan High School, DBH

82 cm disposable formworks 8 cm concrete filling on raft foundation. It was used to raise the foundation level below the architectural level. The application of traditional backfills was also very difficult due to the fact that the project was located on sloping land. In addition, the water tanks of the building would be built on the reinforced concrete slab, which required the traditional backfill to be compacted much better and never cracked.

The reinforced concrete flooring, which was created by using ABS Disposable Formworks, was made very easily and quickly, as well as installation pipes were passed through it, which can be intervened when necessary, and a 100% resistant base was obtained.