NEF 09 Office Project, NEF
01/09/2019
Goztepe Cakmak Flat, Anka Cakmak Construction
Göztepe Anka Flats, Anka Çakmak Construction
02/06/2019
Show all

Pool Deck Filling

Titanic Hotels preferred ABS Disposable Formwork System for pool deck filling at Titanic Mardan Palace Hotel in Lara, Antalya.

Constructing a swimming pool on a flat reinforced concrete foundation or floor slab is much easier and economical than alternative designs. Once the pool sheer walls are erected the pool deck can be constructed using ABS Disposable Formworks. Because the filling is empty inside it could be used as installation passages as well.

Comments are closed.